Installation |
Installation: | Quick and easy. Instructions and pictures are in the maintenance manual. Uncrate and setup takes two men under three hours. Here’s how it happens: |
Uncrate: | Use a power screwdriver to remove crate top and sides |
Lift machine off skid: | A forklift is handy, but we use a manual 1k forklift. |
Attach and level tables: | Each of the 2 tables attach with three bolts and two supports. |
Attach and adjust backstop: | Attach with two bolts. Adjust per manual pictures and instructions. |
Connect electric supply: | The machine comes with cables and standard wall plugs. Plug into a standard 110v or 220v wall outlet. Machines exported are pre-fitted with that country’s standard plug. |
That’s all! | The EZ Slitter is ready to run! Turn on, set slitting speed, and start slitting! |